Operations Scheduling, planning and “Ready-to-Use” service
Doka’s extensive experience and expertise is reflected in the many different ways in which Doka can assist in each phase of erecting a fair-faced concrete structure:
Advice and consulting
  • Analysing the scope of the assignment from the start of the project tendering phase
  • Advice regarding pre-selection of possible formwork systems, taking constructional details into account
  • Submission of cost bids
  • Support at preparatory technical meetings with architects and other key parties on the subject of fair-faced concrete
  • Special customer training events on fair-faced concrete
Planning service
  • Developing custom solutions on the basis of the results agreed in the course of the advice and consulting work
  • Designing the custom formwork solutions using advanced CAD software, also as 3-D graphic representations where needed
  • Drawings for first assignment
  • Visualisation of visible surfaces
  • Ongoing, “on-the-job” planning for the formwork cycle sequences
  • Ongoing, “on-the-job” visualisations of the architectural surfaces
  • Drawing up any necessary formwork-related structural analyses for special components
  • Assistance with drawing up any quality assurance plan which may be necessary
Ready-to-Use Service / formwork-making
  • Pre-assembly of the ordered custom solutions in Doka’s own Ready-to-Use Service workshops
  • Dismantling of the ordered custom solutions
Site support
  • Instruction of site crew by experienced supervising foremen
  • On-site service by formwork technology advisers
  • Provision of detailed “User Information” booklets on the formwork systems
  • Advice regarding continued use of the formwork systems in the course of further construction
  • Support at technical meetings on fair-faced concrete held with architects and other key parties in the course of further work on the site
  • Best practice booklet: “Forming fair-faced concrete”