|
The climbing formwork 150 F is a proven, tried-and-tested system, the particularly economical choice for crane-lift climbing projects.
|
|
 |
-
permits easy adaptation for all construction projects with vertical walls
-
permits speedy positioning and safe anchoring at any height
-
offers working platforms 1.65 m wide, with 70 cm retract distance for the formwork
|
-
reduces labour costs for formwork positioning and retraction without crane
-
reduces crane time, because the entire unit repositions quickly
-
enables speedy erection of the formwork
|
|
| Scissor-action spindles move the formwork elements quickly and easily into position. |
|
|
 |
|
document download
|
 |
pdf
KB |
download list of articles
|
|
 |
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|