|
On account of its modular design principle, the crane-independent automatic climbing formwork SKE is an efficient solution for any type of structure, for steady progress irrespective of weather conditions and maximum safety for the entire construction crew.
|
|
 |
-
because the climbing scaffold is always anchored in the concrete
-
as hydraulic jacks lift the entire unit, there is no need for crane assistance
-
with wide working platforms closed on all sides
|
-
because even large formwork assemblies can be lifted without the need for a crane
-
work proceeds safely despite high winds
|
-
utilises the experience of Doka's centre of expertise for automatic climbing formwork on your site
-
ensures an economical solution with practical project planning
|
| Valley crossing in Crni Kal, Slovenia |
| The angle of inclination can be adjusted even on variable-radius structures. The automatic climbing formwork SKE 50 on site. |
|
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|