Optimised cost-effectiveness deriving from the predefined removal procedure is the characteristic of this low-cost, high-speed system, with site staff on site occupied uniformly for maximum efficiency. The free choice of sheeting leaves nothing to be desired when it comes to the finished structure of the fair-face concrete.
|
|
 |
|
|
The Doka Xtra floor system has integrated removal logic for straightforward, readily understandable work procedures - significantly reducing the quantity of materials, optimising on-site logistics and providing maximum protection for the material used.
|
|
|
 |
-
with three perfectly matched system components for optimised site logistics
• with the 2.65 m Doka beam H20 top as longitudinal and cross beam • with the Doka Xtra prop head with quick lowering device • with high-grade Eurex floor props with consecutively numbered pegging holes and low release forces
-
to protect the material used
• for prolonged usable life • for significantly lower post-use costs
-
for a high degree of flexibility: the formwork can be removed whenever workers are available for the job
|
-
because 75% of the formwork parts can be removed early
-
because quicker removal means that the formwork is ready for re-use all the sooner
|
-
from durable and robust components
-
by combining the special Doka Xtra prop head with Eurex floor props for complete stability during striking of the formwork
-
because the panels can be rented
• with high-grade polyurethane surround for first-class concrete faces and reduced investment costs • with non-slip surfaces for significantly enhanced safety at work
-
with the new Doka beam H20 top
|
|