On the "Lindaupark" project in Lindau, Germany, the high floor-to-ceiling heights were handled easily without additional work on the superstructure. Mushroom-head formwork was used to integrate the column heads into the slabs. The grid logic of the various table formats meant that Dokaflex tables were ideal, the most economical formwork system for the project.
|
 |
|
| A mere 14 months were all the time needed to complete the 27,500 m2 of office space in the Campus M office and technology centre in Munich, Germany – with Dokaflex tables of various sizes, up to and including special made-to-measure trapezoidal formats. Doka's Ready-to-Use service made sure that the tailor-built special Dokaflex tables for the various gradients of the ramp for the multi-storey carpark were on the site precisely when needed. |
|
|
 |
|
 |
 |