|
The innovative design of the Dokamatic table makes for even faster formwork handling whenever large floor slabs have to be cast. Standard functional components can be installed for straightforward, speedy and safe adaptation to changing requirements on the construction site.
|
|
 |
-
because fully assembled units are manoeuvred quickly into place - no laborious carrying of individual components from one location to the next
-
because practical shifting devices make for virtually fatigue-free operations
-
with the new table lifting system TLS for vertical lifts without crane
-
because easier to handle and safer than hand-operated formwork, particularly as room heights increase
|
-
because the integrated table platforms mean fewer working and protection platforms
-
because the props can be set effortlessly for table overhangs up to 1.50 m
-
because of the straightforward system solutions for edge beams and end formwork
-
because of the pivoting and lockable props for unobstructed removal across parapets
|
-
with insertion beams and system connection to the table waling for speedy adaptation to any floorplan
-
with direct connection to the table frames and Staxo load-bearing towers for high room heights
-
with easily adjustable swivel head for speedy adaptation to varying requirements in terms of statics and geometry
-
with the option of using the formwork sheeting that best suits the architectural requirements of the building
|
|
document download
|
 |
pdf
KB |
download list of items
|
|
 |
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|