|
The Doka framed formwork Frami 270 I Frami 300 is a full-height, all-inclusive system with high-end safety and working accessories for foundations, walls and columns.
|
|
 |
-
with torsionally rigid steel frame
• for speedy forming without extra bracing • with high-grade hot-dip galvanisation for durability
-
produces smooth concrete faces on account of the strong formwork panels
-
Frami 270: Permissible fresh-concrete pressureup to pouringheights of 2.70 m: 67.5 kN/m²
-
Frami 300: Permissible fresh-concrete pressureup to pouringheights of 3.00 m: 60.0 kN/m²
|
-
simplifies planning, forming and logistics on the construction site
-
reduces the number of cost-intensive closures
|
-
simplifies planning, forming and logistics on the construction site
-
reduces the number of cost-intensive closures
|
-
with self-aligning, quick-action panel connectors
-
with wide choice of anchor options
|
|
document download
|
 |
pdf
KB |
download list of items
|
|
 |
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|