|
| The façade formwork is seated on the finished precast section and precision-adjusted by means of the panel struts. |
|
|
 |
|
| When the rebars are in place and with the column formwork closed, the precasting is lowered into position, adjusted, and cast along with the column. |
|
|
 |
|
| Once the concrete has set, the façade and column formwork is lifted to the next location, and the level floor is cast. |
|
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|