Parapet elements integrated into cast-in-place columns
The façade formwork is seated on the finished precast section and precision-adjusted by means of the panel struts.
When the rebars are in place and with the column formwork closed, the precasting is lowered into position, adjusted, and cast along with the column.
Once the concrete has set, the façade and column formwork is lifted to the next location, and the level floor is cast.