|
| The façade formwork is seated on the lower-level precast section and precision-adjusted by means of the panel struts. The recessed columns are cast separately. |
|
|
 |
|
| Then the formwork is set up and the concrete poured so that slab and precasting part are integrated. |
|
|
 |
|
| Once the concrete has set the façade formwork is released and lifted to the next location. |
|
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|