| With 160 m height the second highest bridge in Austria: Talübergang Lavant - Object P19. As part of the extension of the Südautobahn A2 section Twimberg - Wolfsberg. Identical in form with the old P19 bridge built 1981-84 (Fa. Steiner Baugesellschaft bmH) |
|
|
 |
|
Bridge type:
|
Girder bridge
|
|
Location:
|
Carinthia (Austria)
|
|
Total construction time:
|
schedule 2005-2007
|
|
 |
|
Total length of bridge:
|
935 m
|
|
Number of spans:
|
6
|
|
Span maximum:
|
160 m
|
|
Piers:
|
8 Piers (highest pier: 136 m)
|
|
Construction method:
|
Free-balanced cantilever construction method
|
|
Cross section:
|
Single box cross section with straight webs
|
|
 |
-
Piers with Doka Climbing Formwork GCS and Doka Framed Formwork Framax Xlife.
-
Doka GCS: structure-guided climbing system moved by the site crane.
-
Hammerhead (pierhead) with Doka Wall Formwork FF20.
|
|
Fa. Steiner Baugesellschaft mbH (Austria)
|
 |
|
 |
 |