Doka - The Formwork Experts
Conesco
References according to type of structure
References according to construction methods
Arch bridges
Balanced cantilever construction
Bridge-edge beam
Composite bridges
Fair face concrete
Search
 
Draubrücke Lippitzbach
As part of the new erection of the Landesstraße L127a near to Klagenfurt, a new steel-concrete bridge is built 100 m high above the river Drau. For the realisation of the superstructure the Doka Expertise Centre for Balanced Cantilevering was the ideal partner for the construction.
Projectdata
Bridge type: Girder bridge
Location: Carinthia (Austria)
Total construction time: 2004-2005
Building data
Total length of bridge: 445 m
Number of spans: 4
Span maximum: 150 m
Piers: 3 Piers (highest pier: 75 m)
Construction method: Free-balanced cantilever construction method
Cross section: Single box cross section with straight webs
Additional information
  • Hammerhead (pierhead) with Doka Wall Formwork FF20.
Contractor
Fa. Massivbau GmbH, Klagenfurt (Austria)
More on this topic
Project information
Pics