|
| The new 211 m long prestressed concrete bridge over the Rhein near to Rheinfelden will directly connect the German Hochrheinautobahn A98 with the Swiss highway system. |
|
|
 |
|
Bridge type:
|
Girder bridge/ two seperated lanes
|
|
Location:
|
Rheinfelden (Germany)
|
|
Total construction time:
|
2004-2005
|
|
 |
|
Total length of bridge:
|
211 m
|
|
Number of spans:
|
3
|
|
Span maximum:
|
101 m
|
|
Piers:
|
2 Piers (highest pier: 13 m)
|
|
Construction method:
|
Free-balanced cantilever construction method
|
|
Cross section:
|
Single box cross section with straight webs
|
|
 |
-
Piers: Complicated 3d-Design of the 13 m high, cone-shaped
|
|
Ed. Züblin AG (Germany)
|
 |
|
 |
 |
More on this topic |
|
|
 |
|