Doka - The Formwork Experts
Conesco
References according to type of structure
References according to construction methods
Arch bridges
Balanced cantilever construction
Bridge-edge beam
Composite bridges
Fair face concrete
Search
 
Bridge Rheinfelden
The new 211 m long prestressed concrete bridge over the Rhein near to Rheinfelden will directly connect the German Hochrheinautobahn A98 with the Swiss highway system.
Projectdata
Bridge type: Girder bridge/ two seperated lanes
Location: Rheinfelden (Germany)
Total construction time: 2004-2005
Building data
Total length of bridge: 211 m
Number of spans: 3
Span maximum: 101 m
Piers: 2 Piers (highest pier: 13 m)
Construction method: Free-balanced cantilever construction method
Cross section: Single box cross section with straight webs
Additional information
  • Piers: Complicated 3d-Design of the 13 m high, cone-shaped
Contractor
Ed. Züblin AG (Germany)
More on this topic
Project information
Pics