|
| Cantilever construction in Spain: Puente sobre el Rio Pisuerga. |
|
|
 |
|
Bridge type:
|
Girder bridge
|
|
Location:
|
Spain
|
|
Total construction time:
|
2004-2005
|
|
 |
|
Total length of bridge:
|
158 m
|
|
Number of spans:
|
3
|
|
Span maximum:
|
80 m
|
|
Piers:
|
2 Piers (highest pier: 5 m)
|
|
Construction method:
|
Free-balanced cantilever construction method
|
|
Cross section:
|
Single box cross section with straight webs
|
|
 |
-
Only the middle span was constructed using free cantilever construction method.
-
The backspans were built using Doka Load-bearing tower d2.
|
|
Drace - Construcciones Especiales y Dragados, S.A.
|
 |
|
 |
 |
More on this topic |
|
|
 |
|