Cantilever construction in Spain: Puente sobre el Rio Pisuerga.
Projectdata
Bridge type: Girder bridge
Location: Spain
Total construction time: 2004-2005
Building data
Total length of bridge: 158 m
Number of spans: 3
Span maximum: 80 m
Piers: 2 Piers (highest pier: 5 m)
Construction method: Free-balanced cantilever construction method
Cross section: Single box cross section with straight webs
Additional information
  • Only the middle span was constructed using free cantilever construction method.
  • The backspans were built using Doka Load-bearing tower d2.
Contractor
Drace - Construcciones Especiales y Dragados, S.A.