B38 Friedrich-Ebert-Bridge / Mannheim
The Friedrich-Ebert-Bridge / Mannheim (undercurrent) is situated directly adjacent and paralell to the existing Friedrich-Ebert-Bridge / (uppercurrent) over the river Neckar.
Projectdata
Bridge type: Slab-and-beam bridge
Location: Germany
Total construction time: 2006
Building data
Total length of bridge: 198 m
Number of spans: 3
Span maximum: 86 m
Piers: 2 Piers
Construction method: Cantilever construction method
Cross section: slabs-and-beams (slab with 2 beams)
Additional information
  • Only the middle span was constructed using cantilever construction method.
  • The formwork for the beams, deck and cantilever slabs were produced in Doka ready-to-use service in Maisach.
Contractor
Dywidag Bau GmbH (Deutschland)