Most cez Dravo na Ptuj
The extradosed bridge Ptuj over the river Drau (Drava) is 430m long, has a width of 18,70m a height of 2,70m, and max. spans of 100m. The demanding superstructure is made with 2 pairs of Wito form travellers and with Doka - large area formwork Top50, starting from the hammerhead in both direction with casting steps of 5m. The bridge has a radius of 460m.
Projectdata
Bridge type: Extradosed Bridge
Location: Ptuj (Slowenien)
Total construction time: 2006
An extradosed bridge is a combination of a cable-stayed bridge and a post-tensioned girder bridge. Typical for this bridge typs are the lower pylons, and there fore are the low-angled cable-stays. The blisters for the stay-cables' anchorage, lie outside the webs.
Building data
Total length of bridge: 430 m
Number of spans: 5
Span maximum: 100 m
Piers: 4 Piers
Construction method: Free-balanced cantilever construction method
Cross section: Single box cross section with inclined webs
Additional information
  • Design by Doka Slovenia. Free balanced cantilevering expertise centre gave support to the site.
  • Abutment with Doka - framed formwork Framax.
  • Back - span, pier and pylon with Doka - large area formwork Top50.
  • Doka products used to erect the hammerhead:
    - Doka - supporting construction frame universal F
    - Doka - load bearing tower Staxo
    - Doka - large area formwork Top50
Contractor
Porr d.o.o. Maribor (Slovenia)
Doka responsibility
Commercial: Miro Kelbl
Technical Slovenia: Ivan Zajc