Doka - The Formwork Experts
Conesco
References according to type of structure
References according to construction methods
Arch bridges
Balanced cantilever construction
Bridge-edge beam
Composite bridges
Fair face concrete
Search
 
Project information
Werratal Bridge
Project data
Type of bridge: Composite Bridge
Location: BAB A 71, Meiningen/Suhl, Germany
Total construction time: 2001-2003
Bridge data
Length: 1194 m
Height: ~ 27 m
Method: back-step technique
Step lenght: up to 25 m
Steps: 51
Additional info
Formwork traveler, back-step technique, weekly cycle, modular system
Contractor
ARGE Bilfinger Berger und Brückenbau Plauen
www.bilfingerberger.de
Formwork design
Organisation in Country: Deutsche Doka, NL Nürnberg
Sales Representative: Mr. Thomas Gehle, Sales Manager NL Nürnberg
Technical Manager: Mr. Andeas Puchner, TB Nürnberg
Department Maisach: Composite Bridge Expertise Centre
More on this topic
Project information
Pics
Plans