Bro över Örekilsälven
Örekilsälven 1
Overslung composite forming carriage
Project data
Type of bridge: arched bridge, composite bridge
Location: European route E6, Munkedal, Sweden
Total construction time: ~ 40 months
Bridge data
Length: 477,00m
Bridge high: ~ 85,00m
Method: back-step technique
Step length: ~ 20,00m
Steps: 32
Additional info
  • Overslung composite formwork carriage, back-step technique, weekly cycle, modular system
Contractor
NCC Construction Schweden AB Göteburg
  E-Mail: NCC Construction Sweden AB Göteborg
Formwork design
Organisation in Country: Doka Sweden
  E-Mail: Christian Fahrenheim, project engineer, Doka Sweden
Contact: Expertise Centre 4 "Composite Bridges", Munich
  E-Mail: Markus Johann, project engineer CC4
  E-Mail: Thomas Streicher, project technician CC4