P19, Bridge over the Lavant-valley
Overslung composite forming carriage
Project data
Type of bridge: Steel composite bridge
Location: P19, Lavant-valley
Total construction time: approx. 12 months
Bridge data
Length: 687,00m
Bridge high: ~ 140,00m
Method: back-step technique
Step length: ~ 25,00m
Steps: 28
Additional info
  • Overslung composite formwork carriage, back-step technique, weekly cycle, modular system
Contractor
Steiner-Bau GesmbH
A-9470 St. Paul/Lavanttal
  E-Mail: Steiner-Bau GesmbH
Formwork design
Organisation in Country:

Österreichische Doka
Schalungstechnik GmbH
Niederlassung Klagenfurt
  E-Mail: NL Klagenfurt
Contact competence center 4 "Composite Bridges", Munich
  E-Mail: Markus Johann, project engineer CC4
  E-Mail: Carsten Beer, project engineer CC4