| Overslung composite forming carriage |
|
|
|
 |
|
Type of bridge:
|
Steel composite bridge
|
|
Location:
|
P19, Lavant-valley
|
|
Total construction time:
|
approx. 12 months
|
|
 |
|
Length:
|
687,00m
|
|
Bridge high:
|
~ 140,00m
|
|
Method:
|
back-step technique
|
|
Step length:
|
~ 25,00m
|
|
Steps:
|
28
|
|
 |
-
Overslung composite formwork carriage, back-step technique, weekly cycle, modular system
|
Steiner-Bau GesmbH A-9470 St. Paul/Lavanttal
|
 |
Organisation in Country:
Österreichische Doka Schalungstechnik GmbH Niederlassung Klagenfurt
|
 |
|
Contact competence center 4 "Composite Bridges", Munich
|
 |
|
 |
 |