Building 3 & 4 Hardman Sq Spinningfields
An expansion of Manchester's rapidly growing commercial domain, Spinningfields is a superbly realized managed business district, extending from Deansgate. Altogether there will be twelve signature buildings, a 5-star hotel and a bank erected. Round walls, complex geometries - no problem with the Doka Guided Climbing Formwork GCS.
Project data
Type of building: High-rise building
Location: Manchester, UK
Start of construction: September, 2005
Total construction time: ~ 14 months
Construction time core: ~ 6 months
Building data
Height: ~ 50 m
Method: Cores ahead
Step height: Regular step height 3,88 m
Steps: 12
Additional info
  • 1-2 weeks per step
  • 10 cm wall thickness change
  • changing step heights
Contractor
John Doyle Construction Ltd.
www.johndoyleconstruction.co.uk
Formwork design
Organisation in Country: Doka UK
  E-Mail: Mr. Simon Dowd (Sales Representative)
  E-Mail: Mr. Richard Seers (Technical Manager)
Contact Engineering Amstetten
  E-Mail: Mr. Michael Eder (Projectmanager Amstetten)
More on this topic
Project information
Pics
Plans
Products in use
Doka climbing formwork GCS
Doka large-area formwork Top 50
Doka framed formwork Framax Xlife
More on this topic
Find more on www.spinningfields-manchester.com