Project information
AstraLux
In Riga, contractors SIA PBLC had only 5 months to construct the shell of the 24-storey “Astralux” apartment building.
The only way to stay within a timeframe
as tight as this is by using top quality formwork technology. The Windshield GCS system from Doka provided complete safety for the slab forming operations, and rapid construction progress. A self-climbing formwork solution for the walls of the structure core saved yet more time.
Project data
Type of building: High-rise building
Location: Riga, Latvia
Start of construction: May, 2006
Construction time: ~ 5 months
Building data
Heights: ~ 81 m
Method: Slab and wall poured together
Step height: Regular step height: 3,20m
Floors: 24
Steps: 26
Additional infos
  • 4 days cycle
  • In the core the large-area formwork Top 50 working together with the framed formwork Framax Xlife
  • Core will be build with Doka automatic climbing formwork SKE 100
  • Windshield GCS on the facade
Contractor
PBLC
www.pblc.lv
Formwork design
Organisation in country: Doka Latvia
  E-Mail: Mr. Janis Pinnis (Sales Representative)
  E-Mail: Mr. Janis Jautaikis (Technical Manager)
Contact Self-climbing Systems Expertise Centre Amstetten
  E-Mail: Mr. Hannes Stolzlechner (Projectmanager Amstetten)
More on this topic
Project information
Pics
Plans
More on this topic
Doka automatic climbing formwork SKE
Doka climbing formwork GCS
Doka large-area formwork Top 50
Doka framed formwork Framax Xlife
More on this topic
Find more on www.ni.pblc.lv