Project information
Tunnel Ottsdorf
This twin-tube motorway tunnel with 2 lanes in each tube has an overall length of 1,940 m. By using 2 Doka forming carriages, 48 m per week were casted in pouring sections of 24 m length. Interesting is the monolithic production of bottom, walls and slab. About 1,000 m³ concrete per section were poured.
Project data
Type of building: twin-tube motorway tunnel
Method: cut and cover construction method
Location: Ottsdorf, Austria
Formwork system: Doka large-area formwork Top 50
Duration of insert: 1 year
Building data
Purpose of the tunnel: motorway tunnel
Section: rectangular
inside width: 9,75 m
inside height: 5,56 m
Formed tunnel length: 1.940 m
Steps: 80
Additional info
For this procject the formwork carriage of the Steinhaus tunnel was reused. Therefore the system´s width had to be modificated.
Contractor
Strabag AG
Formwork design
Organisation in Country: Österreichische Doka
Department Amstetten: DOKA Engineering Department
Project Manager: Mr. Andreas Bemmer
  E-Mail: tunnel@doka.com