| This twin-tube motorway tunnel with 2 lanes in each tube has an overall length of 1,940 m. By using 2 Doka forming carriages, 48 m per week were casted in pouring sections of 24 m length. Interesting is the monolithic production of bottom, walls and slab. About 1,000 m³ concrete per section were poured. |
|
|
 |
|
Type of building:
|
twin-tube motorway tunnel
|
|
Method:
|
cut and cover construction method
|
|
Location:
|
Ottsdorf, Austria
|
|
Formwork system:
|
Doka large-area formwork Top 50
|
|
Duration of insert:
|
1 year
|
|
 |
|
Purpose of the tunnel:
|
motorway tunnel
|
|
Section:
|
rectangular
|
|
inside width:
|
9,75 m
|
|
inside height:
|
5,56 m
|
|
Formed tunnel length:
|
1.940 m
|
|
Steps:
|
80
|
|
 |
|
For this procject the formwork carriage of the Steinhaus tunnel was reused. Therefore the system´s width had to be modificated.
|
 |
|
Strabag AG
|
 |
|
Organisation in Country:
|
Österreichische Doka
|
|
Department Amstetten:
|
DOKA Engineering Department
|
|
Project Manager:
|
Mr. Andreas Bemmer
|
|
 |
|
 |
 |