The systems´s high load capacity makes wide drive-through openings possible.
|
|
|
 |
|
Type of building:
|
avalanche gallery
|
|
Location:
|
Sellrain, Austria
|
|
Formwork system:
|
Doka large-area formwork Top 50
|
|
|
Doka heavy-duty supporting system SL-1
|
|
Duration of insert:
|
6 months
|
|
 |
|
Section:
|
rectangular
|
|
inside width:
|
10.20 m - 11.30 m
|
|
inside height:
|
5.25 m
|
|
Formed tunnel length:
|
243 m
|
|
Steps:
|
14
|
|
 |
The avalanche gallery is built in cut-and-cover construction method and assures the country road in the Austrian Sellraintal. The total length is 243 m.
|
 |
Strabag AG
|
 |
|
Organisation in Country:
|
Ă–sterreichische Doka, Niederlassung West
|
|
Technical Manager:
|
Mr. Reinhard Luger
|
|
Project Manager:
|
Mr. Mario Scheiring
|
|
 |
|
 |
 |