The avalanche gallery is built in cut and cover construction method with a total length of 216 m.
|
|
|
 |
|
Type of building:
|
avalanche gallery
|
|
Location:
|
Stubaital, Austria
|
|
Formwork system:
|
Doka large-area formwork Top 50
|
|
|
Doka heavy-duty supporting system SL-1
|
|
Duration of insert:
|
5 months
|
|
 |
|
Section:
|
circular
|
|
inside width:
|
8.74 m
|
|
inside height:
|
6.45 m
|
|
Formed tunnel length:
|
216 m
|
|
Steps:
|
22
|
|
 |
Up to 5 pouring steps à 10,30 m where completed in record-breaking two weeks.
|
 |
Thurner Hoch- und Tiefbau, Innsbruck
|
 |
|
Organisation in Country:
|
Österreichische Doka
|
|
Department Amstetten:
|
DOKA Engineering Department
|
|
Technical Manager:
|
Mr. Alois Schoißwohl
|
|
Project Manager:
|
Mr. Markus Stastny
|
|
 |
|
 |
 |