Base tunnel Bodio
The lot 505 of the base tunnel Bodio started as a twin-tube section. At a length of 120 m it splits up into two separate tubes. The length of there tubes is 290 m each.
Projektdaten
Type of building: Tunnel
Method: cut and cover construction method
Location: Switzerland
Formwork system: Doka large-area formwork Top 50, Doka heavy-duty supporting system SL-1
Duration of insert: 22 months
Building data
Purpose of the tunnel: railway
Section: circular
inside width: 7,40 m
inside height: 7,40 m
Formed tunnel length: twin-tube 120 m, two several tubes per 290 m
Steps: 64
Additional info
After 20 steps the twin-tube splits up. Only additional external formwork panels are placed.
Contractor
Mancini & Marti, Bellinzona
Formwork design
Organisation in Country: Holzco-Doka Schalungstechnik AG
Technical Manager: Mr. August Morf
  E-Mail: tunnel@doka.com