|
| Landscape-bridge - two concrete tubes with a length of 115 m each |
|
|
 |
|
Type of building:
|
Tunnel
|
|
Method:
|
Cut-and-cover construction method
|
|
Location:
|
Germany
|
|
Formwork system:
|
Doka heavy-duty supporting system SL-1, Doka large-area formwork Top 50
|
|
Duration of insert:
|
6 months
|
|
 |
|
Purpose of the tunnel:
|
Road tunnel
|
|
Section:
|
circular
|
|
inside width:
|
13.50 m
|
|
inside height:
|
6.80 m
|
|
Formed tunnel length:
|
2 x 115 m
|
|
Steps:
|
13
|
|
 |
|
Twin tube road tunnel formed economical with Doka standard formwork
|
 |
|
Ed. Züblin AG
|
 |
|
Organisation in Country:
|
Deutsche Doka
|
|
Technical Manager:
|
Mr. Martin Zinnert
|
|
|
|
|
 |
|
 |
 |
more on this topic |
|
|
 |
 |
products in use |
|