Tunnel Meuschaer Höhe
Landscape-bridge - two concrete tubes with a length of 115 m each
Project data
Type of building: Tunnel
Method: Cut-and-cover construction method
Location: Germany
Formwork system: Doka heavy-duty supporting system SL-1, Doka large-area formwork Top 50
Duration of insert: 6 months
Building data
Purpose of the tunnel: Road tunnel
Section: circular
inside width: 13.50 m
inside height: 6.80 m
Formed tunnel length: 2 x 115 m
Steps: 13
Additional info
Twin tube road tunnel formed economical with Doka standard formwork
Contractor
Ed. Züblin AG
Formwork design
Organisation in Country: Deutsche Doka
Technical Manager: Mr. Martin Zinnert