| Construction of a 1093 m long avalanche gallery |
|
|
 |
|
Type of building:
|
Avalanche gallery
|
|
Method:
|
Cut-and-cover construction method
|
|
Location:
|
Tyrol, Austria
|
|
Formwork system:
|
Large-area formwork Top 50,
Heavy-duty supporting system SL-1
|
|
Duration of insert:
|
12 months
|
|
 |
|
Section:
|
circular
|
|
inside width:
|
9.00 m
|
|
inside height:
|
8.06 m
|
|
Formed tunnel length:
|
1,093 m
|
|
Steps:
|
92
|
|
|
|
|
 |
The buildings total length is 1093 m. 140 m are constructed as closed cut-and-cover section. 960 m of the building are build as cut-and-cover arch cross section.
There three columns replace the valley-sided tunnel wall. The complete tunnel section (including the columns) was casted jointless in one pour.
|
 |
|
Held & Francke Bauges.mbH
|
 |
|
Organisation in Country:
|
Österreichische Doka
|
|
Department Amstetten:
|
DOKA Engineering Department
|
|
Project Manager:
|
Mrs. Dagmar Ziegler
|
|
 |
|
 |
 |