| Doka heavy-duty supporting system SL-1 proved itself at a railway tunnel |
|
|
 |
|
Type of building:
|
Railway tunnel
|
|
Method:
|
cut-and-cover construction method
|
|
Location:
|
Gernlinden, Germany
|
|
Formwork system:
|
Doka heavy-duty supporting system SL-1, Doka wall formwork FF20
|
|
Duration of insert:
|
3.5 months
|
|
 |
|
Section:
|
rectangular
|
|
inside width:
|
6.60 m
|
|
inside height:
|
6.54 m
|
|
Formed tunnel length:
|
250 m
|
|
Steps:
|
14
|
|
|
|
|
 |
|
The combination SL-1/FF20 addicted a extremely high part of rentable components.
|
 |
|
Bauer Spezialtiefbau GmbH
|
 |
|
Organisation in Country:
|
Deutsche Doka
|
|
Project Manager:
|
Mr. Leonhardt Dirk
|
|
|
|
|
 |
|
 |
 |