| In the course of the extension of the brenner railway connection a twin-tracked new stretch in the Tyrolean Unterinntal between Kundl and Baumkirchen was constructed. 32 km of the 40 km length had to be erected as a tunnel. In the contract section H4-3 Stans - main civil works Stans - a ground water tank as well as a tunnel in cut-and-cover construction method and mining special construction method with an overall length of 2.615 m are build for the new track. |
|
|
 |
|
Type of building:
|
Tunnel
|
|
Method:
|
cut-and-cover construction method
|
|
Location:
|
Tyrol, Austria
|
|
Formwork system:
|
Doka heavy-duty supporting system SL-1, Doka large-area formwork Top 50
|
|
Duration of insert:
|
20 months
|
|
 |
|
Purpose of the tunnel:
|
railway
|
|
Section:
|
circular
|
|
inside width:
|
11,40 m
|
|
inside height:
|
8,60 m
|
|
Formed tunnel length:
|
655
|
|
Steps:
|
67
|
|
 |
|
As a result of the long application period and the complicated basic conditions (bulkhead, ground water, twin-water bar implementation, ...) Doka developed a hydraulic inside formwork arriage including a stopend formwork consisting of custom-made steel panels.
|
 |
Alpine Bau GmbH
www.alpine.at
Contact: TGF Mr. BM Ing. Wolfgang Eichinger
|
 |
|
Organisation in Country:
|
Österreichische Doka
|
|
Technical Manager:
|
Mr. Hanspeter Hamerle
|
|
Department Amstetten:
|
Tunnel Expertise Centre
|
|
Project Manager:
|
Mr. Martin Zabern
|
|
 |
|
 |
 |