References according to type of structure
References according to construction methods
Doka climbing systems
Doka tunnel formwork
Cut & Cover construction method
Mining construction method
Top Cover construction method
Bridge construction with Doka formwork
Fair face concrete
Search
Doka tunnel formwork
By-pass Tunnel Henndorf
Koralmbahn contract section 5,1 Grafenstein - Althofen
Fundamental refurbishment of the Tunnel Ennerich
Brenner-Eisenbahn H4-3 Stans
GK Project
Tunnel Gernlinden
L25 Erlach gallery Defreggental
Service cavern Cern
Tunnel Dekani
U2/2 Vienna Taborstrasse
By-pass Brixen, contract section 1
H5 extension tunnel Stans-Terfens
B174 Innsbrucker Road
Runway tunnel airport Vienna
Tunnel Meuschaer Höhe
Base tunnel Bodio
Rapid transit turntable Linz
Gallery Goldschrofen
Gallery Ludererkurve
Noise protection tunnel Trebesing
Tunnel Javorova
Tunnel Hornberg
Underground-extension Munich - Garching
Tunnel Ottsdorf
By-pass Telfs
Tunnel Bruckhäusl
A7 overhead noise barrier Bindermichl - Sub-crossing tunnel
A7 overhead noise barrier Bindermichl - Tunnel LZ11 - facing formwork west tunnel
A7 overhead noise barrier Bindermichl - Cover-formwork LZ11
Tunnel Steinhaus
Tunnel Kirchham
Lötschberg Base Tunnel
Jet-vent tunnel - Lötschberg
Rock guard gallery Stilfserjoch