| Strabag assigned Doka with the delivery of the formwork equipment for two length emergency pull-over tunnels. The length of each part was 50 m. |
|
|
 |
|
Type of building:
|
Tunnel
|
|
Method:
|
mining method
|
|
Location:
|
Croatia
|
|
Formwork system:
|
Doka large-area formwork Top 50
|
|
Duration of insert:
|
5 months
|
|
 |
|
Purpose of the tunnel:
|
Motorway tunnel
|
|
Section:
|
circular
|
|
inside width:
|
13,54 m
|
|
inside height:
|
8,04 m
|
|
Formed tunnel length:
|
2 x 50 m
|
|
Steps:
|
2 x 8
|
|
 |
|
8 pouring sections were necessary to form the two 50 m length emergency pull-over tunnels. Each week one step was completed.
|
 |
|
Strabag AG
|
 |
|
Organisation in Country:
|
Österreichische Doka
|
|
Department Amstetten:
|
DOKA Engineering Department
|
|
Project Manager:
|
Mr. Jürgen Bachbauer
|
|
 |
|
 |
 |