| Trumpet shaped tunnel of the southern reversion loop line. |
|
|
 |
|
Type of building:
|
Tunnel
|
|
Method:
|
Mining method
|
|
Location:
|
Linz, Austria
|
|
Formwork system:
|
Doka large-area formwork Top 50, Doka heavy-duty supporting system SL-1
|
|
Duration of insert:
|
6 weeks
|
|
 |
|
Purpose of the tunnel:
|
Tram tunnel
|
|
Section:
|
circular
|
|
inside width:
|
6,40 m - 11,50 m
|
|
inside height:
|
6,43 m
|
|
Formed tunnel length:
|
32 m
|
|
Steps:
|
4
|
|
 |
In front of and behind of the central station two reversion loop, single track lines were built.
In the reversion loop line the future elongation of the streetcar line 3 is considered.
The formwork carriage was shared into two carraiages to form the trumpet-shape. For the connection to the future line, a short tube section was prepared.
|
 |
|
G. Hinteregger & Söhne, ÖSTU Stettin, Dyckerhoff & Widmann
|
 |
|
Organisation in Country:
|
Österreichische Doka, Niederlassung Oberösterreich
|
|
Project Manager:
|
Mr. Martin Zabern
|
|
|
|
|
 |
|
 |
 |