Rapid transit turntable Linz
Trumpet shaped tunnel of the southern reversion loop line.
The photos present a partly assembled formwork system. Because of this, the necessary railings and platforms are not finished concerning to the usual security-standards.
Project data
Type of building: Tunnel
Method: Mining method
Location: Linz, Austria
Formwork system: Doka large-area formwork Top 50, Doka heavy-duty supporting system SL-1
Duration of insert: 6 weeks
Building data
Purpose of the tunnel: Tram tunnel
Section: circular
inside width: 6,40 m - 11,50 m
inside height: 6,43 m
Formed tunnel length: 32 m
Steps: 4
Additional info
In front of and behind of the central station two reversion loop, single track lines were built.

In the reversion loop line the future elongation of the streetcar line 3 is considered.

The formwork carriage was shared into two carraiages to form the trumpet-shape. For the connection to the future line, a short tube section was prepared.
Contractor
G. Hinteregger & Söhne, ÖSTU Stettin, Dyckerhoff & Widmann
Formwork design
Organisation in Country: Österreichische Doka, Niederlassung Oberösterreich
Project Manager: Mr. Martin Zabern
  E-Mail: tunnel@doka.com