For the U2/2 Taborstrasse Vienna metro extension, 2 station tubes were constructed using mining-type tunnel formwork consisting of pre-assembled Top 50 elements and a falsework construction made from the Heavy-duty supporting system SL-1. In each of the 110 m long tubes, typical blocks of 10 m in length had to be formed.
|
|
|
 |
|
Type of building:
|
tunnel
|
|
Method:
|
Mining method
|
|
Location:
|
Vienna, Austria
|
|
Formwork system:
|
Doka heavy-duty supporting system SL-1
Doka large-area formwork Top 50
|
|
Duration of insert:
|
6 months
|
|
 |
|
Purpose of the tunnel:
|
underground
|
|
Section:
|
circular
|
|
inside width (m):
|
8.40 m
|
|
inside height (m):
|
7.70 m
|
|
Formed tunnel length:
|
222 m
|
|
Steps:
|
24
|
|
 |
To permit the travelling tunnel-formwork unit S1-S24 to be travelled from one main tube to the next, it was designed so that it could be separated into two halves. The travelling tunnel-formwork unit was wheeled through the interconnecting tunnel and rebuilt there ready for forming further blocks.
|
 |
ARGE U2/2 - Hinteregger, Östu-Stettin, W&F
|
 |
|
Organisation in Country:
|
Österreichische Doka
|
|
|
|
|
Department Amstetten:
|
DOKA Engineering Department
|
|
Project Manager:
|
Mr. Markus Stastny
|
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |