Project information
U2/2 Vienna Taborstrasse
For the U2/2 Taborstrasse Vienna metro extension, 2 station tubes were constructed using mining-type tunnel formwork consisting of pre-assembled Top 50 elements and a falsework construction made from the Heavy-duty supporting system SL-1. In each of the 110 m long tubes, typical blocks of 10 m in length had to be formed.
Project data
Type of building: tunnel
Method: Mining method
Location: Vienna, Austria
Formwork system: Doka heavy-duty supporting system SL-1 Doka large-area formwork Top 50
Duration of insert: 6 months
Building data
Purpose of the tunnel: underground
Section: circular
inside width (m): 8.40 m
inside height (m): 7.70 m
Formed tunnel length: 222 m
Steps: 24
Additional info
To permit the travelling tunnel-formwork unit S1-S24 to be travelled from one main tube to the next, it was designed so that it could be separated into two halves. The travelling tunnel-formwork unit was wheeled through the interconnecting tunnel and rebuilt there ready for forming further blocks.
Contractor
ARGE U2/2 - Hinteregger, Östu-Stettin, W&F
Formwork design
Organisation in Country: Österreichische Doka
Department Amstetten: DOKA Engineering Department
Project Manager: Mr. Markus Stastny
  E-Mail: tunnel@doka.com