Doka tunnel formwork carriages for the motorway between Ljubljana and the Adriatic Sea.
|
|
|
 |
|
Type of building:
|
4 emergency pull-over tunnel, 5 cross tunnel
|
|
Method:
|
Mining method
|
|
Location:
|
Slovenia
|
|
Formwork system:
|
Doka large-area formwork top 50
|
|
|
Doka heavy-duty supporting system SL-1
|
|
Duration of insert:
|
6 months
|
|
 |
|
Purpose of the tunnel:
|
Motorway
|
|
Section:
|
circular
|
|
inside width (m):
|
12.70 m
|
|
inside height (m):
|
7.80 m
|
|
Formed tunnel length:
|
200 m
|
|
Steps:
|
36
|
|
 |
Trumpet-shaped transition between cross tunnels and emergency pull-over tunnel.
|
 |
|
Contractor:
|
Company Primorje
|
|
Contact:
|
Mr. Iztok Likar
|
|
 |
|
Organisation in Country:
|
Doka Slovenija
|
|
Technical Manager:
|
Mr. Zajc
|
|
 |
|
 |
 |