Tunnel Dekani
Doka tunnel formwork carriages for the motorway between Ljubljana and the Adriatic Sea.
Project data
Type of building: 4 emergency pull-over tunnel, 5 cross tunnel
Method: Mining method
Location: Slovenia
Formwork system: Doka large-area formwork top 50
Doka heavy-duty supporting system SL-1
Duration of insert: 6 months
Building data
Purpose of the tunnel: Motorway
Section: circular
inside width (m): 12.70 m
inside height (m): 7.80 m
Formed tunnel length: 200 m
Steps: 36
Additional info
Trumpet-shaped transition between cross tunnels and emergency pull-over tunnel.
Contractor: Company Primorje
Contact: Mr. Iztok Likar
www.primorje.si
Formwork design
Organisation in Country: Doka Slovenija
Technical Manager: Mr. Zajc
  E-Mail: tunnel@doka.com