Search
 
Project information
Fundamental refurbishment of the Tunnel Ennerich
Detachable tunnel formwork carriage on railway tracks whilst maintaining railway service
Project data
Type of building: Tunnel
Method: mining method
Location: Runkel, Germany
Formwork system: Doka large-area formwork Top 50
Doka heavy-duty supporting system SL-1
Duration of insert: 6 months
Building data
Purpose of the tunnel: Fundamental refurbishment
Section: circular
inside width: 8,08 m
inside height: 9,56 m
Formed tunnel length: 494 m
Steps: 9
Additional info
The contractor Franz Kassecker GmbH awarded Doka with the contract to supply the formwork construction equipment, which is capable of being divided into two independently travelling formwork carriages.

In order to make it possible to drive through the landmarket entrance and into the tunnel the formwork carriage is equipped with special wheels to allow for integrated transverse movement. Also the slab formwork elements have the ability to swivel by hand winches.

To ensure the maintenance of the railway traffic all the concrete and formwork operations were solely performed during scheduled weekend down-times.
Contractor
Franz Kassecker GmbH

Contact: Mr. Andreas Malzer

www.kassecker.de
Formwork design
Organisation in Country: Deutsche Doka
Branch Nuremberg
Technical Manager: Mr. Klaus Meschke
Department Amstetten: Tunnel Expertise Centre
Project Manager: Mr. Robert Riesenberger
Contact: tunnel@doka.com
More on this topic
Project information
Pics
Cross-section
Operating sequence
Products in use
Doka heavy-duty supporting system SL-1
Doka large-area formwork Top 50