A7 overhead noise barrier Bindermichl - Tunnel LZ11 - facing formwork west tunnel
The formwork system allows to pour 180 m² wall each day.
Project data
Type of building: Tunnel
Method: Top cover construction method
Location: Linz, Austria
Formwork system: Doka large-area formwork Top 50
Duration of insert: 3.5 months
Building data
Purpose of the tunnel: Noise protection project
Section: rectangular
inside width (m): 15,75 m
inside height (m): max. 6,25 m
Formed tunnel length: 500 m
Steps: 35
Additional info
  • The LZ11 tunnel was the third building stage for the Doka heavy-duty supporting system SL-1 in the Bindermichl projekt. The former stages were already finished and so it was possible to reuse the SL-1 material for the carriage of the last step.
  • The system´s weight was 130 to and it´s width was up to 15.75 m. This was the biggest span for horizontal scaffolds that was done with SL-1 components so far.
Contractor
ARGE A7 Betonbau (Strabag, Alpine Mayreder, Porr, Held & Franke)
Contact: Mr. Ecker, Mr. Knollmüller
Formwork design
Organisation in Country: Österreichische Doka - Niederlassung Oberösterreich
Mr. Martin Zabern (Project Manager)

Department Amstetten: Tunnel Expertise Centre
Mr. Christian Heuböck (Head of Tunnel Expertise Centre)
  E-Mail: tunnel@doka.com
more on this topic
Project information
Pics
Plans
Mehr dazu
Load-bearing tower SL-1
Doka large-area formwork Top 50