Project information
Runway tunnel airport Vienna
In the course of the Vienna International Airport expansion an already existing railway tunnel which undercrosses the airport runways had to be strengthened.
Project data
Type of building: Tunnel
Method: Top cover construction method
Location: Vienna, Austria
Formwork system: Doka heavy-duty supporting system SL-1
Doka framed formwork Framax Xlife
Doka large-area formwork Top 50
Duration of insert: 9 months
Building data
Purpose of the tunnel: Railway tunnel
Section: rectangular
inside width: 5.50 m
inside height: 6.90 m
Formed tunnel length: 730 m
Steps: 87
Additional info
For reasons of fire protection the railway tunnel had to be strengthened between the existing sheet pilings. Therefore a 45 cm thick fibre reinforced wall facing with integreated slab brackets were casted. This measure ensures the construction´s static resistance in case of fire.
Contractor
Porr Technobau und Umwelt AG
Kontakt: Mr. Dipl.-Ing. Harald Metzinger, Mr. Ing. Georg Pleva
www.porr.at
Formwork design
Organisation in Country: Ă–sterreichische Doka, Niederlassung Wien
Project Manager: Mr. Thorsten Kirchweger
  E-Mail: tunnel@doka.com