Located about halfway between the German cities of Cologne and Mönchengladbach, Neurath is where Strabag AG has been commissioned by RWE Power AG to undertake construction work on a new lignite-fired power plant with optimised plant technology (BoA). The two-unit plant will have a generating capacity of 2 x 1100 MW and is only the second of its kind. The new plant utilises the energy stored in lignite about thirty-three percent more effectively than older lignite-fired plants, saving up to three million metric tons of CO2 per annum.
|
|
 |
|
|
Doka is the reliable provider the formwork used in the carcass-work phase of the Neurath lignite-fired power plant for the slot-bottom bin, both boiler-house buildings, the main switchgear building and other structures.
|
|
|
 |
|
Doka is the reliable provider of formwork for the slot-bottom bin, both boiler-house buildings, the main switchgear building and other structures. The formwork specialists have worked closely with the construction experts from Strabag AG from the submission and quotation phase onward, and gave a convincing demonstration of their abilities by developing an efficient custom solution for the slot-bottom bin.
|
 |
|
Contractor: Strabag AG, Duisburg, Germany
|
|
 |
|
 |
 |
Products in use |
|