|
In each of the 11 storeys, the Dokaflex tables stood always at the same position. This made forming easy and fast for the contractor Tricastle. The structure core and two smaller staircases climbed ahead, using climbing formwork MF 240. This also accelerated construction work.
|
|
|
 |
|
 |
 |
products in use |
|