News
Fairs & Events
Formwork News
2008
2007
2006
01
2005
2004
2003
2002
2001
2000
1999
Formwork News 1/2006
Safety when working at height
Articles
Editorial
Doka USA provides the tables for retirement community
Doka shields London´s tallest residential riverside building
Climbing cantilever formwork saves on equipment and costs
Tight topping out deadline made possible by Dokaflex slab formwork
High adaptability for complex floors
Safe and streamlined concreting of 160 m high piers
Record-breaking bridge pylons being built with Doka automatic climbers
Challenging formwork task for remarkable domed building
Keeping Beetham Tower on target
Spectrum of shapes in Manchester
Köröshegy Viaduct: Safe resetting even in strong winds
First cable-stayed bridge construction in Maine, USA, relies on Doka Formwork