Alongside its long-standing and successfully launched systems, Doka also presented a whole slew of innovations to an interested French and international trade public at Intermat 2003:
Intermat 2003
Like its new Falsework SL-1, for example, a variable modular "kit" for large-area shoring units. Thanks to its high load-bearing capacity, the new system can sustain very high slab loads.
The Dokaflex table – one of the most important innovations of recent years – makes for highly efficient forming of floor-slabs, because the tables are pre-assembled and can be repositioned very quickly indeed using a shifting trolley with an attachable electric drive unit.
Doka façade formwork is a particularly easy way of joining in-situ concrete edge columns and pre-cast parapets, enabling work to move ahead rapidly on structures that are being erected in a "hybrid" mode of construction.
The Framax extra-large panels 2.70 x 2.70 m make for extremely efficient forming of walls, and thus rapid progress of work, particularly in the residential construction field.

For special assignments with self-compacting concrete, there is the new Framax universal panel SCC, which makes it possible to fill the formwork from below (which is advantageous in the case of SCC).

And for superlative quality concrete surfaces: The new "Doka 3-S plus" 3-ply sheet.

Our offerings for the civil engineering field are equally important, however: The comprehensive spectrum of Doka services helps you master complex planning and logistics tasks, and to optimise even difficult formwork assignments.
Luderer-Kurve avalanche gallery
The sturdy system components of the new Doka falsework SL-1 make it possible to leave sufficiently wide drive-through access openings free, as is required in the construction of tunnels.
Using a shifting trolley with an attachable electric drive unit, one person - working on their own - can quickly and effortlessly move large Dokaflex-table forming units.
Dokaflex table
Le Narval
On structures being erected in a "hybrid" mode of construction (combining pre-cast members with in-situ concrete), the new façade formwork makes for rapid progress of work.