Lincoln Park 2520, Chicago, IL
|
|
|
 |
|
Designed with powerful single-stroke cylinders that support and climb all formwork, platforms and placing boom.
|
|
 |
-
A single stroke cylinder moves the core with forms, placing boom and all level working platforms into the next level.
-
No need to strip forms into units - a simple ratchet operation is all you need. This keeps the core forms as a single unit and cuts down labor cost and speeds up construction cylce.
-
No shoes or profiles to be climbed or handled.
-
An incorporated leveling mechanism for up to 10 cyclinders - each lifting up to 90kips-eliminates any extra labor during climbing.
-
No extra work or bracing required to handle the loads of the biggest placing booms in the market - keeping the cost and labor down.
|
|
 |
| Steve Likens, Superintendet, Walsh Construction |
| “The Super Climber was chosen because of its simple anchoring application and the ease of a component bracket base set-up. The high load-bearing rigid super structure is engineered for a mounted concrete placing boom, and the impressive hydraulic climbing cylinders and pump provide us with a safe, fast, and efficient lift from floor to floor.” |
|
|
 |
|
 |
 |
More on this topic |
|
|
 |
 |
References |
|