This cooling-tower formwork is a fully mechanised, self-climbing large-area formwork system. It maximises rationalisation and minimises manual labour – after a short familiarisation period, the crew will soon be accomplishing the casting sections in a 1-day cycle.
|
|
 |
Maximum safety for your site crew
|
|
 |
|
Safety in all phases of the work
|
 |
-
even at great heights in strong winds, as the formwork is always firmly attached to the structure
-
by means of telescopic working platforms – these are railed-in and gapless even while climbing is in progress, and so provide a safe working environment at all times
-
thanks to optimally adapted platform widths and integrated ladder systems
|
Rapid working in a controlled sequence
|
|
 |
|
Optimised formwork concept for fast forming-times
|
 |
-
large-area formwork gangs, making the system much simpler to operate and clean
-
inclination of whole scaffold can be adjusted from one central spindle
-
built-in reinforcement holders in the scaffold, making it a quick and easy job to place the reinforcement
|
Very high cost-efficiency for your cooling tower
|
|
 |
|
A cost-effective solution is ensured by
|
 |
-
all-round platforms that permit "de-linkage" of operational sequences
-
very small number of form-tie points per square metre
-
consistently high concrete quality, thanks to the steel form-facing
-
large-area formwork gangs for a casting-section height of 1.5 m
-
the practice-oriented project planning provided by Doka
|
|
 |
 |