Residential construction
Industrial construction
Construction of office buildings
Water-resources engineering
Transportation infrastructure
Stadiums and sports arenas
Search
Royal London Hospital
For the 3 structure cores each 36 m high, the new Framax stripping corners I were on duty and shortened significantly the construction time.
Each shaft required 8 pouring sections, 3 sections were poured in 8 days.
London, UK, 2003
Laing O'Rourke