Residential construction
Industrial construction
Construction of office buildings
Water-resources engineering
Transportation infrastructure
Stadiums and sports arenas
Search
The Pearson
37-storey tower block was growing in a 4-day cycle.
Structure core formwork: SKE 50 with Top 50.
Chicago, USA, 2002
James Mc Hugh Construction, Chicago
products in use
Doka climbing system
Doka large area formwork Top 50
Doka framed formwork Framax Xlife