|
A 170 m long section of the 1 km long tunnel passed beneath a runway of the airport. This part had to be cast in the shortest time possible.
The high walls between the base plate and the ceiling were cast using self-compacting concrete. |
|
|
 |
|
ARGE STT - Marti AG / Hatt-Haller AG
|
|
 |
|
 |
 |
products in use |
|