Doka - The Formwork Experts
Conesco
Residential construction
Industrial construction
Construction of office buildings
Water-resources engineering
Transportation infrastructure
Stadiums and sports arenas
Search
 
Tunnel Hornberg
Hornberg
Overall length: 1880 m. The 10 m long Doka forming carriage for the emergency lay-bys was assembled from Doka load-bearing tower SL-1 and large-area formwork Top 50.

Purpose: Bypass Hornberg
Germany 2003/2004
ARGE Tunnel Hornberg (Ilbau Deutschland GmbH and Hermann Kirchner GmbH & Co. KG)
products in use
Doka load-bearing tower SL-1
Doka large-area formwork Top 50