Doka - The Formwork Experts
Conesco
Residential construction
Industrial construction
Construction of office buildings
Water-resources engineering
Transportation infrastructure
Stadiums and sports arenas
Search
 
Gallery Goldschrofen
Goldschrofen
12 m long forming carriage made of load-bearing tower Sl-1 and large-area formwork Top 50.

Every 2 weeks 5 concreting sections, each one 10,30 m long, were finished.
Austria, 2003
Stubaier Gletscherbahnen KG
products in use
Doka load-bearing tower SL-1
Doka large-area formwork Top 50