The Brayton Point Power Plant, New England's largest fossil-fueled generating facility, flushes 1.3 billion gallons of water a day into Mount Hope Bay.
Having the highest standard of safety, high cost effectiveness, and easy and safe handling equipment, Doka USA will be proud to display the largest and most flexible sets of solutions anywhere in the market.
The cast-in-place concrete bridge will be the longest continuous segmental span in the United States with a total length of 2,975 feet and a main span of 760 feet.
Doka USA, a leading formwork engineering and products company, will hold a ribbon-cutting ceremony on April 25. for their new facility in Channahon, Ill.
The innovative Dokamatic table was designed to dramatically increase formwork handling production whenever medium and large floor slabs have to be cast.