calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Ottawa Hunt Club Bridge

Canada

With a wall inclination of almost 72-degrees and two fin-shaped walls that intersect at a height of 16-meters, as well as the creation of an inclined column to extend a further 16 meters, Doka formwork was the key to success.

Back

Project data

Year of completion
2013
Project duration
12 Months
Country
Canada
Town or city
Ottawa, ON
Realization
Louis W. Bray Construction Limited
Structure
Bridge
Type of structure
Piers and pylons

Pylon

Construction method
Inclined
Cross-sectional shape
Solid slab
Structure height
32 m
Height of casting sections
16 m
Number of spans
1
Length of bridge (superstructure)
75 m
Width of bridge (superstructure)
4.8 m
Height of bridge (up to top edge of superstructure)
5.68 m
Form-tie pattern
Not stipulated