Climbing formwork 150F

The tried-and-test­ed crane-jumped form­work

Easy to set up, easy to op­er­ate – proven thou­sands of times over

The Climb­ing form­work 150F is a site-proven sys­tem that gives very cost-ef­fi­cient ser­vice on crane-lift­ed climb­ing pro­jects.

In­ge­nious mo­d­u­lar sys­tem

with on­ly a very few se­parate parts

Climb­ing form­work 150F is ex­treme­ly easy to set up, and fea­tures

  • easy adap­ta­tion to all con­struc­tion pro­jects with ver­ti­cal walls

  • fast set-up and safe an­chor­ing at any height

  • 1.65 m wide work­ing plat­forms with a 70 cm roll-back for the form­work

  • op­ti­mum form­work ad­justa­bil­i­ty in all di­rec­tions

Easy han­dling, rapid work­ing

in ev­ery phase of the work

With this easy-to-op­er­ate crane-jumped form­work, you can

  • cut your labour costs, as the form­work can be set up and struck with no need for a crane

  • cut your crane time, as the form­work and scaf­fold can be lift­ed to­gether in one piece

The system's fully railed-in working platforms and integrable ladder system ensure the necessary safety for working at lofty heights.